• Close the discharge valve and deadhead for 2 minutes
• Pump must not experience jog, erratic cycling or leaks
• Open discharge valve and expel the remaining DI water
• Prepare the pump for drying

4.9.b Dry Pump

• Connect vacuum hose to discharge line
• Connect purge line to fluid inlet
• 60 psig Supply Pressure
• Cycle pump & vacuum dry by rotating pump side to side for 30 seconds.
• Turn off Air Supply and allow the pump to purge for 5 minutes.

4.9.c Dry Suction

• 20 psig Supply Pressure Target
• Record Suction Value
• Target = 14 in-Hg.

PAGE 24