beautypg.com

Kenco Engineering Chemical Injectors (standard and mini) User Manual

Page 2

background image

Installation

1. Inspect Chemical Injector for any possible damage incurred during shipment.
2. Apply thread sealant to male pipe threads on the Chemical Injector and install into pipeline.
3. Install the Injector so that the “FLOW” arrow on the check valve body is facing in the direction of

flow. This positions the aspirator and injector tip angle for optimal chemical dispersion. NOTE: For
injectors made of CPVC, an orientation groove is provided instead of a “FLOW” arrow. Install the
injector so that the orientation groove is facing upstream.

4. Apply thread sealant to male pipe threads on mating fitting and install into the injector FNPT

chemical feed port.

Removal

1. Blow down pipeline section before removing Chemical Injector. CAUTION: Loosening the MNPT

process pipe connection can result in a hazardous condition in which pressurized fluids may be
released and which may result in injury or damage.

2. Remove attached components and mating fittings.
3. Carefully remove injector.

P.O. Box 470426

Tulsa, OK 74147-0426
Phone (918) 663-4406

Fax (918) 663-4480

E-mail: [email protected]

http://www.kenco-eng.com

67090

(02-27-13)