beautypg.com

Watts LF007 User Manual

Series lf007, Lead free, Double check valve assemblies

background image

For Non-Health Hazard Applications

ES-LF007

Now Available

WattsBox Insulated Enclosures.

For more information, send for literature ES-WB.

Series LF007

Double Check Valve Assemblies

Sizes:

1

2

" – 3" (15 – 80mm)

Series LF007 Double Check Valve Assemblies shall be installed at

referenced cross-connections to prevent the backflow of polluted

water into the potable water supply. Only those cross-connections

identified by local inspection authorities as non-health hazard shall

be allowed the use of an approved double check valve assembly.

The LF007 features Lead Free* construction to comply with Lead

Free* installation requirements.
Check with local authority having jurisdiction regarding vertical orien-

tation, frequency of testing or other installation requirements.
The valve shall meet the requirements of ASSE Std. 1015 and

AWWA Std. C510. Approved by the Foundation for Cross-

Connection Control and Hydraulic Research at the University

of Southern California.

Features

• Ease of maintenance — only one cover
• Top entry
• Replaceable seats and seat discs
• Modular construction
• Compact design
•  Lead Free* cast copper silicon alloy body construction —

1

2

" – 2" (15 – 50mm)

• Fused epoxy coated cast iron body — 2

1

2

" – 3" (65 – 80mm)

• Top mounted Lead Free* ball valve test cocks
• Low pressure drop
• No special tools required for servicing
• 

1

2

" – 1" (15 – 25mm) have tee handles

Specifications

A Double Check Valve Assembly shall be installed at each noted

location. The assembly shall consist of two positive seating check

modules with captured springs and rubber seat discs. The check

module seats and seat discs shall be replaceable. Service of

all internal components shall be through a single access cover

secured with stainless steel bolts. The Double Check Valve

Assemblies shall be constructed using Lead Free* cast copper

silicon alloy. Lead Free* Double Check Valve Assemblies shall

comply with state codes and standards, where applicable, requir-

ing reduced lead content. The assembly shall also include two

resilient seated isolation valves; four top mounted, resilient seated

test cocks. The assembly shall meet the requirements of ASSE

Std. 1015 and AWWA Std. C510. Approved by the Foundation for

Cross-Connection Control and Hydraulic Research at the University

of Southern California. Assembly shall be a Watts Series LF007.

Test Cocks

First Check

Module Assembly

The LF007 Series features a modular design concept which facilitates

complete maintenance and assembly by retaining the spring load.

Second Check

Module Assembly

*The wetted surface of this product contacted by consumable

water contains less than 0.25% of lead by weight.

Watts product specifications in U.S. customary units and metric are approximate and are provided for reference only. For precise measurements,
please contact Watts Technical Service. Watts reserves the right to change or modify product design, construction, specifications, or materials with-
out prior notice and without incurring any obligation to make such changes and modifications on Watts products previously or subsequently sold.

3

4

" (20mm) LF007M3QT

Job Name –––––––––––––––––––––––––––––––––––––––––––

Contractor ––––––––––––––––––––––––––––––––––––––––––––

Job Location –––––––––––––––––––––––––––––––––––––––––

Approval –––––––––––––––––––––––––––––––––––––––––––––

Engineer –––––––––––––––––––––––––––––––––––––––––––––

Contractor’s P.O. No. ––––––––––––––––––––––––––––––––––

Approval –––––––––––––––––––––––––––––––––––––––––––––

Representative ––––––––––––––––––––––––––––––––––––––––

LEAD FREE

*

NOTICE

Inquire with governing authorities for local installation requirements