WATER PRESSURE: A minimum of 25 pounds of water pressure is required for regeneration valve to operate
effectively.

ELECTRICAL FACILITIES: A continuous 115 volt, 60 Hertz current supply is required. (Other voltages available.)
Make certain the current supply is always hot and cannot be turned off with another switch.

EXISTING PLUMBING: Condition of existing plumbing should be free from lime and iron buildup. Piping that is built up
heavily with lime and/or iron should be replaced. If piping is clogged with iron, a separate iron filter unit should be
installed ahead of the water softener.

LOCATION OF SOFTENER AND DRAIN: The softener should be located close to a drain.

BY-PASS VALVES: Always provide for the installation of a by-pass valve.

CAUTION: Water pressure is not to exceed 120 p.s.i., water temperature is not to exceed 110

°

F, and the unit cannot

be subjected to freezing conditions.

INSTALLATION INSTRUCTIONS

1. Place the softener tank where you want to install the unit making sure the unit is level and on a firm base.

(Maximum 7 feet apart for twin units.) To provide for expansion and contraction of plastic resin tanks and rigid
plumbing loads, use FLEXIBLE FITTINGS at the valve.

2. All plumbing should be done in accordance with local plumbing codes. The pipe size for the drain line should be the

same size as the drain line flow control connection. Water meters are to be installed on soft water outlets. Twin
units with (1) one meter shall be installed on common soft water outlet of units.

3. Make sure that the floor is clean beneath the salt storage tank and that it is level.

4. Place approximately 1

of water above the grid plate (if used) in your salt tank. Salt may be placed in the unit at this

time.

5. Place in by-pass position. Turn on the main water supply. Open a cold soft water tap nearby and let run a few

minutes or until the system is free from foreign material (usually solder) that may have resulted from the
installation.

6. Place the by-pass in service position.

7. Manually index the softener control into “service” position and let water flow into the mineral tank. When water flow

stops, close inlet valve, place control in “backwash” position to relieve head of air, then gradually open inlet valve to
purge remaining air in tank. Return control to “service” position.

8. Electrical: All electrical connections must be connected according to codes. Use electrical conduit if applicable.

Plug into power supply.