3 installation, 1 preparing the liquid handling station, Preparing the liquid handling station – Metrohm Liquid Handling Station User Manual
Page 14

3.1 Preparing the Liquid Handling Station
■■■■■■■■■■■■■■■■■■■■■■
6
■■■■■■■■
3 Installation
The installation of the Liquid Handling Station is accomplished in three
main steps.
1.
Preparing the Liquid Handling Station.
2.
Mounting and aligning the Liquid Handling Station on the sample
changer.
3.
Defining the work positions of the sample tube for the Liquid Han-
dling Station.
3.1
Preparing the Liquid Handling Station
If the Liquid Handling Station is to be used for dilutions, then it must be
converted.
The following instruments are required for this purpose:
■
Liquid Handling Station
– Left-handed version, 6.2841.120
or
– Right-handed version, 6.2841.130
■
Magnetic stirrer, 2.741.0010
CAUTION
Use caution and do not apply excessive force when carrying out the fol-
lowing procedures.
The conversion is carried out through the following steps:
Removing the magnetic stirrer dummy
1 Remove the mixing vessel from the main body by hand.