Brewer installation – Brew Express BE-110 INSTALLATION User Manual
Page 15

5. Bring 1/4” water supply line to cut opening. Bring water
line through grommet in rough-in-box (See Supply Detail).
Slide rough-in-box into opening while pulling about 18” of
water line through grommet hole. Secure rough-in-box to wall
stud with sheet rock screws. PURGE WATER LINE by running
water to clean any possible debris. Cut water line to length
(approx. 3”) inside rough-in-box and attach male quick
connector. Use wrench to tighten and secure.
See Male Connector Detail and figures 5 and 7.
IMPORTANT:
Water line to brewer must be flushed and a filter installed.
Should debris clog brewer system ALL WARRANTIES VOID.
Check for leaks.
4. Place rough-in-box on a towel or cardboard to protect
counter surface. Bring power supply wire from source to cut
opening as shown in Figure 4. Minimum 12-2 wire required.
Be sure to have an additional length of approximately 18” at
rough-in-box opening for installation of box. Remove power
panel cover. Install strain relief (not supplied) in hole. Run
power supply wire through strain relief and secure power
supply wire (See Supply Detail, page 11). Connect power
supply wires to power panel supply wires and secure with
wire nuts (See Wiring Detail, page 11). Connect green wire
to green wire, black to black and white to white.
12
BrEwEr INSTALLATION
Figure 5
Supply Detail
Wiring Detail
Male Connector Detail
Figure 4