Brewer installation – Brew Express BE-110 INSTALLATION User Manual
Page 13

10
BrEwEr INSTALLATION
IMPORTANT:
If installing unit PRIOR to cabinets, it is strongly advised to consult with cabinet maker and build-
ing contractor for exact height of counter top due to the various thicknesses of counter tops (tile
laminate, granite, etc). For best results cut hole and install unit AFTER cabinets are installed.
A. Installing BREW EXPRESS on Counter
It is best to install the unit so the bottom edge is just above the
counter top. In an existing home, this may require part of the
back splash to be removed. Use template provided to
determine the location to be cut out for rough-in-box.
B. Installing BREW EXPRESS with Full Back Splash
Use template provided to determine the location to be cut
out for rough-in-box. Ensure fit is correct by first placing
rough-in-box in cut out hole. Remove rough-in-box. Finish
installation of full height back splash to cut opening. If full
height back splash is granite or tile, it is recommended to
cut opening and install rough-in-box after surface is complete.
IMPORTANT: DO NOT COMPLETE INSTALLATION OF
ROUGH-IN-BOX BEFORE BACK SPLASH.
C. Installing BREW EXPRESS above Back Splash
If you prefer a continuous back splash, the unit can be installed
above the back splash. Use template provided to find best fit.
IMPORTANT: WHEN INSTALLING THE UNIT ABOVE BACK
SPLASH, BE CERTAIN THERE IS SUFFICIENT ROOM BELOW
THE CABINETS.