Pg. 4, Installation – Unisteer 8010780-02 Chevelle Power Rack & Pinion Kit 1964-67 User Manual
Page 4
pg. 4
655680
11. Remove four bolts retaining stabilizer bar mount bushing & let stabilizer hang free from links.
Installation:
1. Your rack & pinion has been shipped to you assembled & screwed to the mounting bracket.
Do Not Remove Rack & Pinion from Bracket.
2. Pull down on stabilizer bar & install racket bracket from over top of the bar. Note: Make sure
you install the assembly with tie rods on underside of stabilizer.
3. Slide bolts through drive-side frame & through bracket.
4. Slide bolts through passenger side frame into bracket & start nuts. Leave loose.
5. Connect outer tie rods to steering knuckle & adjust the rods by eye to keep front wheels
straight.
6. Tighten outer tie rod ends to 35 ft. lbs.
7. Install power steering pressure line smaller line to lower port on rack assembly and tighten.
8. Install return line to upper port larger line to rack assembly & tighten.
9. Make sure lines are pointing toward front of car & route lines upward towards pump. Note:
Make sure lines do not interfere with pulleys, belts, etc.