TruXedo Chevrolet Composite Box User Manual
Truxedo, inc, Truxedo, Lo pro chevy composite box instructions
STEP 1: Locate side rail as shown in Owner’s Manual. Mark hole
locations on inside of composite box, using pre-punched
mounting slots as guides. Repeat for other side rail.
STEP 2: Drill 9/32” holes at marked locations.
P/N 1115436 Rev. B
To install TruXedo
®
Lo-Pro side rails on your composite box, follow these instructions. Cap screws, flat washers, and lock nuts replace
standard clamp assemblies in your TruXedo
®
Lo-Pro kit. Read all instructions before installing.
STEP 3: Fasten side rails to inside of composite box with 1/4” x
1 1/2” cap screws, washers and lock nuts. Install cap
screws through stake pockets.
mounting
slot
mark
location
&
drill
9/32”
hole
1/4”
x
1 1/2”
cap
screw
side
rail
1/4”
flat
washer
1/4”
nylon
lock
nut
Note: Refer to thetruXedo
®
Lo Pro manual for
complete assembly instructions.
equipment Required
• Power drill with 9/32 bit
• 7/16” Wrench
• Pencil or Chalk
1/4”
x
1 1/2”
cap
screw
side
rail
1/4”
flat
washer
1/4”
nylon
lock
nut
tRuXedo
®
Lo Pro Chevy ComPosite Box instruCtions
stake
stake
pre
-
punched
mounting
slot
rear view
pickup
top
rail
flush
t
ru
x
edo
®
l
o
p
ro
side
rails
Note: truXedo
®
Lo-Pro composite box side rails
have two (2) pre-punched mounting slots.
TruXedo, inc.
P.o. Box 1078, 2209 Kellen Gross Dr., yankton, south Dakota 57078
Call toll Free: 1-877-truxeDo (1-877-878-9336) Fax: (605) 664-9304 visit us online: http://www.truxedo.com