Mise en route start-up inbetriebsetzung – Sulky VISION 1 DPB User Manual
Page 37

Select the EPAN menu
Check that: • the fertiliser selection is correct,
• hydraulic shutters are closed,
Select
et execute the fixed station trial.
Select the dose/ha:
use the numeric pad directly, validate by
.
You are spreading in DPA mode.
You can modulate the dose/ha: select
or
and return to baseline flow rate by selecting
.
You can start the TRIBORD or select
to modulate the RH side or select
to modulate the LH side.
Return to the same the same left/right dose by selecting
.
37
Mise en route
Start-up
Inbetriebsetzung
Select the REG menu.
Make sure that all parameters are correctly entered and saved : rate coefficient
and working width
.
Select your fertilisers
.
A
1
2
3
Select the INFO menu.
Select the PAR/TOT mode.
Reset each counter to zero with the RAZ or RESET function.
Upon hearing the first sound alarm and watching a bell appearing on the screen, select
to know the cause(s).
Select OK to return to the baseline menu.
Select
if you want to save your work.
B
1
2
3
4
5
C
1
2
3
4
5
6
GB