A ir g a s – RKI Instruments SM-2009U User Manual
Page 24

20 • Setting the Bump Test and Calibration Parameters
7. Use the BUMP
▼
and CAL.
▲
buttons to set the parameter to the
desired value, then press and release the EDIT ENTER button.
The “E” next to the battery icon will disappear.
8. Repeat step 5 - step 7 to set any other parameters.
9. When you are done setting the parameters, use the BUMP
▼
button to scroll past AUTO-C. The DECISION screen will appear
momentarily to indicate that the parameter changes have been
saved and then the GX-2009 will return to the TRANSMIT screen.
Setting the Calibration Parameters
Do the following to set the calibration parameters after establishing a
connection between a GX-2009 and the SM-2009U.
1. Turn on the SM-2009U with a GX-2009 and establish a connection
between them as described above in "Turning On the SM-2009U
with a GX-2009". The GX-2009 will display the TRANSMIT screen.
2. Press and release the EDIT ENTER button. The GX-2009 will
display the following screen.
3. Press and release the CAL.
▲
button. The GX-2009 will display the
following screens alternating between the two calibration
parameters and their settings.
4. If you wish to cancel setting the calibration parameters or were just
viewing the parameters to confirm their values, press and release
the CAL.
▲
button to return to the TRANSMIT screen.
50 12.0
TRANSMIT
CO ppm H2S ppm
CH4 %LEL OXY vol%
50 25.0
BUMP/CAL
A ir G A S
CAL
3 0 6 0
CAL