Transport and installation, Packing, Transport – Retsch MM 200 User Manual
Page 12: Intermediate storage

5/21/2012
12
Retsch GmbH
Transport and installation
Target group: operating authority, transporter,
operators
Packing
Packing is adapted to the transport route and
conforms to generally applicable packaging guidelines.
Please keep the packing material for the duration of the
guarantee period since if there is a complaint and the
machine is returned with inadequate packing your
guarantee claim will be at risk.
Transport
The MM 200 must not be knocked, shaken or thrown
during transport. Othewise the electronic and
mechanical components can become damaged.
Temperature variations
If temperature variations are high (e.g. during air
transport) the MM 200 must be protected against
condensed water. Otherwise the electronic components
can become damaged.
Intermediate storage
Ensure that the MM 200 is also stored dry during
intermediate storage.
- BB 50 (41 pages)
- BB 100 (24 pages)
- BB 200 (24 pages)
- BB 300 (24 pages)
- Cryomill (68 pages)
- CryoMill Autofill 50l (28 pages)
- DM 200 (20 pages)
- DM 400 (60 pages)
- Emax (67 pages)
- GM 200 (44 pages)
- GM 300 (44 pages)
- MM 400 (32 pages)
- PM 100 (44 pages)
- PM 400 (36 pages)
- PM GrindControl (48 pages)
- RM 200 (36 pages)
- RS 200 (32 pages)
- SK 100 (24 pages)
- SM 100 (48 pages)
- SM 200 (48 pages)
- SM 300 (44 pages)
- Cyclone - SM 300 (20 pages)
- SR 200 (24 pages)
- SR 300 (24 pages)
- TWISTER (44 pages)
- ZM 200 (32 pages)
- AS 200 jet - Automatic Vacuum Regulation (6 pages)
- AS 200 control - natural frequency (32 pages)
- AS 200 (36 pages)
- AS 200 jet (56 pages)
- AS 200 jet (48 pages)
- AS 200 tap 30.025.0001 (28 pages)
- AS 200 tap 30.025.1001 (28 pages)
- AS 300 (32 pages)
- AS 400 (32 pages)
- AS 400 (28 pages)
- AS 450 basic (40 pages)
- AS 450 basic (44 pages)
- AS 450 control (52 pages)
- DR 100 (40 pages)
- DR 100 (28 pages)
- PP 25 (32 pages)
- PP 40 (28 pages)
- PT 100 (36 pages)