Now cover the whole floor, tapes, gasket
and walls with one coat of Puragum and
allow to dry for another 3 hours, then apply
a second coat. Ensure the Puragum goes up
to the edge of the gully groove ensuring
you overlap the gasket with the two coats of
Puragum, then leave to dry for a minimum
of 24 hours before tiling depending on site
conditions.
Once the second coat of Puragum has
fully cured, check the tapes and gasket
are fully secure and sealed before
tiling.
Ensure the tanking kit is installed as per the
instructions. Ensure you follow the tanking
kit instructions and that all porous surfaces
such as concrete and plasterboard are
primed with Puragum Primer. Also ensure
that the tapes and membranes are fully
secure before tiling.
Ensure you keep to the minimum
drying times. Drying times could be
longer depending on site conditions.
Height adjustment
screws
02831
Puragum
For tiles of height between 10-26mm the six
or eight adjustment screws are available in
two separate lengths in order to manage tiles
between 10-26mm.
Adjust the height of the adjustment screws to
the height of the tile including the thickness
of the bed of tile adhesive you are going to
use so it is flush with the top of the tiles.
Never use power tools to screw in the screws.
NOTE: Rebate: The tiles should be butted up
to the rebate (see diagram), but never cover
the rebate on the grate itself.
Place the gasket around the gully to check
if it fits. Take the Pura Elastomeric Tapes and
dry cut to all wall and floor joints.
Once the MS Polymer has tacked over, using
a brush or roller apply the Puragum to all
wall and floor joints one at a time. Apply the
Pura Elastomeric Tapes while the Puragum is
still wet, firmly smoothing down the tape as
you go so there are no air pockets or ridges
left and the tapes are fully adhered.
Leaving the height adjusting screws in their
holes, apply the Puragum up to the edge of
the groove of the gully ensuring you have
enough Puragum to overlap the gasket.
Then mount the gasket membrane to the
upper part of the channel by using the
Puragum. Firmly smooth down the gasket
and tapes so there are no air pockets or
ridges left and the gasket is fully adhered.
Make sure the gasket is centred.
Now allow to dry for 3 hours.
Falls in screed
Falls in scr
eed