Inspect for Shipping Damage
Series 322 Load Unit
Installation
39
Installation
Load Unit installation consists of these four major tasks —
•
Inspect for Shipping Damage
•
Unpack and Move the Platen
•
Install the Crosshead Assembly
•
Make Connections, Bleed Lifts, Tighten Columns
Special equipment needed —
•
An overhead crane and lifting slings or chains capable of lifting the load unit
•
Torque wrenches:
322.21 – 700 lbf·ft (950 N·m) capacity
322.31 – 1400 lbf·ft (1900 N·m) capacity
322.41 – 1400 lbf·ft (1900 N·m) capacity
•
Molykote G-n paste
Inspect for Shipping Damage
Look for the following:
•
Scratches in the load unit or lift cylinder columns
•
Damaged electrical connections
•
Damaged hydraulic connections
•
Dents and other structural damage
•
Torn, kinked, or breaking hoses
Report any damage found to both the carrier and MTS. In the U.S. and Canada,
call the MTS HELPLine at 1-800-328-2255. Elsewhere, contact your local MTS
office.
Load Unit
Standard Dimension Platen
Weight
322.21
28 X 40 in
711 X 1016 mm
3000 lb
1370 kg
322.31
34 X 40 in
864 X 1016 mm
4500 lb
2050 kg
322.41
42 X 60 in
1067 X 1524 mm
8500 lb
3870 kg