Unpacking and Inspection
Series 316 Load Frame Product Information
Installation
39
Installation
This section provides installation instructions for Series 316 Load Frame. MTS
System Corporation recommends that the procedures in the following
subsections be performed in the order given or referenced to minimize the chance
of damage to equipment or injury to personnel.
Unpacking and Inspection
Unpacking Load
Frame
If the load frame is shipped in the horizontal position strapped to a wooden skid,
it should be uncrated and tipped to its upright position before it is moved. Use
the following procedure:
1. Carefully cut and remove the strap form around the load frame using an
appropriate tool. Some load frames are bolted to the skid. Remove these
bolts if applicable.
2. Series 316 load Frames are shipped with eye bolts installed in the holes in
the top of the crosshead.
A. Attach lifting chain hooks (or equivalent) to all lift point eyebolts or
hoist rings. Ensure chain hooks are secure and of sufficient capacity
for the task (see
on page 9 for the weight of frame.)
B. Block the bottom of the load frame to prevent slipping as the load
frame is raised.
C. Slowly lift load frame to vertical position.
Unpacking Direct
Shear
1. Remove direct shear assembly with guide rails from crate.
2. Carefully cut and remove holding straps to direct shear assembly.
Inspection
Inspect the load frame for evidence of structural damage. Inspect any electrical
connectors mounted on the load frame base for damage and cleanliness. If
shipped with hydraulic hoses attached, inspect the hose for evidence of damage
and leakage. Inspect the hose connections fitting for damage.