beautypg.com

Mayline Mobile Lite User Manual

Page 7

background image

Drive Box Installation:

1. Remove the cover (fig. E) from the Responsive Drive Box (RDB).

2. Slide the RDB using top two mounting holes over the two 1/2"-13 bolts (fig. B) extending from
the center of the carriage. These bolts are held in place by (4) jam nuts (fig. A) which are left in

position.

3. When the RDB is seated against the jam nuts (fig. A), install 1/2" washers (fig. C) and tighten

the two 1/2"-13 nylon nuts (fig. D) which are in the accessory bag.

4. Attach chain to middle sprocket assembly, to the bottom sprocket assembly (front drive
channel) and around the chain idler. ONLY USE MASTER LINK (half link not required).

5. Assemble the end shelving unit. This can be done after the RDB assembly has begun. The
type of shelving used will determine how the RDB is fastened to the shelving

6. At this time secure the drive box at the top as well as the bottom. Make sure the Responsive

Drive Box is square and parallel to the shelving. Drill two 1/4" holes at the top of the drive box
into the 4-post upright and secure with (2) 1/4"-20 screws and nuts. The head of the screw

should be on the inside of the 4-post upright to prevent interference with filing media. When the
upper screws are secure and the Responsive Drive is properly positioned, you may tighten the
two 1/2" nuts at the bottom (fig. D).

7. Install the cover (fig. E) using the six sheet metal screws provided (fig. F). ATTACH E-CLIP
TO HANDLE SHAFT
.

8. Insert square key into key slot on handle shaft.

9. Attach 3/4" E-Clip (fig P) over square key in slot on shaft. Note: the tab on the interior of

E-Clip should rest next and NOT on top of square key, so that E-Clip snaps firmly into place on

shaft.

10. Install (fig N, fig O), detent locking plate, using two 1/4-20 Countersunk screws.

11. Install the handle (fig K) using the 3/16" x 3/16" x 1/2" square key (fig J). Install the 1-1/16"

Jam Nut (fig L). Tighten the jam nut (fig L) with the 1-1/16" thin wall socket (not provided). BE
SURE BACK OF HANDLE IS SEATED AGAINST THE E-CLIP ON THE SHAFT
. Install the

black dome plug (fig M).

NOTE: The black dome plug (fig. M) is notched so that it will only fit one way into handle.
Line up black dome cut away with detent in handle. DO NOT force black dome into place.

12. The Responsive Drive Installation is complete and you may now install the remainder of the

shelving. Install shelving per manufacture's specs. Secure shelving through corner / center

plates. TEK screws are found in accessory box.

(7)