Commissioning and operation
Important notes
5
EN
11
Lenze ¯ MA 12.0015 ¯ 1.0
5
Commissioning and operation
5.1
Important notes
(
Stop!
The drive may only be commissioned by skilled personnel!
¯
Take safety measures prior to any operation:
–
Disconnect the machine from the mains, ensure standstill of the drive system
and avoid any machine movement.
5.2
Before switching on
Please check:
¯
Drive function - machine function assignment
¯
The direction of rotation of the drive shaft
g700 with servo motor
¯
Does the drive appear undamaged?
¯
Is the mechanical fixing o.k.?
¯
Is the electrical connection correct?
¯
Are all rotating parts and surfaces that may become hot protected against
contact?
5.3
During operation
During operation, check the drive periodically and take special care of:
¯
changes compared to normal operation, like
–
unusual noise, stronger vibrations or increased temperatures,
–
leakages,
–
loose fixing elements,
–
the condition of the electrical cables.
¯
In case of faults:
–
shut down the drive,
–
check the troubleshooting table.
If the fault cannot be remedied, please contact the Lenze customer service.