Installation, 1 site requirements, 1 general site requirements – Leica Biosystems CM3050 S User Manual
Page 16: 2 electrical connections, 2 unpacking and installation, 1 repacking, Site requirements, Unpacking and installation

16
Instructions for Use V 1.7 RevC - 08/2014
3.2 Unpacking and installation
Unpacking instructions are always located in a
transparent protective envelope on the outside
of the instrument shipping crate.
Make sure to read and follow all safe-
ty instructions provided in chapter
2.3.1 ‘Transport’ and on the unpacking
instructions!
3.2.1 Repacking
We recommend to keep the original shipping
crate and the unpacking instructions for the
Leica CM3050 S.
For repacking, proceed as per unpacking in-
structions, in reverse order.
Available models
• Basic instrument
- with sectioning motor
- without specimen cooling
• Basic instrument
- without sectioning motor
- with specimen cooling
• Basic instrument
- with sectioning motor
- with specimen cooling
3.1 Site requirements
Make sure to read and follow all safe-
ty instructions in chapter 2.3.2 ‘Site re-
quirements’!
3.1.1 General site requirements
• No direct sunlight.
• Electrical power supply within distance
(length of power cord = approx. 4 meters -
do not use extension cords!).
• No draft (caused by air conditioning etc.).
• Even floor surface.
• Practically vibration-free floor.
• Handwheel easily accessible.
• Room temperature constantly below +22 °C.
• Relative humidity of air maximum 60 %.
High ambient temperature and/or high
air humidity negatively affect instru-
ment cooling performance!
3.1.2 Electrical connections
Make sure to read and follow all safe-
ty instructions in chapter 2.3.3 ‘Electri-
cal connections’!
3. Installation