Operating procedures – JULABO FD200 Flow-Through Cooler User Manual
Page 15

15
Accessory: Clamp for cooler probe FT200/400 - order no. 8 970 400
5.3.
Tube connection FD200
Connect the tubes and secure with tube clamps.
discharge (9)
intake
(10)
Recommended flow rate:
2 to 3 l/min
6. OPERATING
PROCEDURES
6.1. Power
connection
Caution:
Only connect the unit to a power socket with earthing contact (PE –
protective earth)!
The power supply plug serves as safe disconnecting device from the line
and must be always easily accessible.
Never operate equipment with damaged mains power cables.
Regularly check the mains power cables for material defects (e.g. for
cracks).
We disclaim all liability for damage caused by incorrect line voltages!
Make sure that the line voltage and frequency match the supply
voltage specified on the type plate.
Deviations of ±10 % are permissible.