Heidolph Incubator 1000 User Manual
Page 18

18
E
Install holder (E) with two screws and spring washer from your hardware bag on bottom
of heater module (B).
Locate heater module on the right of shaker (A).
Plug rubber feet of shaker in cutouts of holder.
Install lower part of hood (C) in shaker and heater module.
If necessary move tray so that cut outs of the lower part of hood (C) can be joined with
the tray.
B
E
See also other documents in the category Heidolph Equipment:
- Hei-VAP Precision (59 pages)
- Hei-VAP Value (84 pages)
- Rotacool Mini (104 pages)
- Rotacool (15 pages)
- RotaChill (37 pages)
- ROTAVAC valve control (188 pages)
- ROTAVAC valve control (174 pages)
- ROTAVAC vario control (34 pages)
- ROTAVAC Vario pumping unit (61 pages)
- LABOROTA 4000 eco (168 pages)
- LABOROTA 4000 up to 4003 (364 pages)
- Heating bath HB 4000 (52 pages)
- LABOROTA 20 eco (180 pages)
- LABOROTA 20 compact and safety (284 pages)
- LABOROTA 20 automatic (190 pages)
- ROTAVAC 20 (35 pages)
- Automatic Module Distimatic (52 pages)
- Synthesis 1 (268 pages)
- MR Hei-Standard (39 pages)
- MR Hei-End (124 pages)
- MR Hei-Mix L (24 pages)
- MR Hei-Mix S (34 pages)
- EKT Hei-Con (78 pages)
- Heat-On (13 pages)
- StarFish Multi-Experiment Work Station (17 pages)
- RZR 1 (44 pages)
- RZR 2020 (58 pages)
- RZR 2051 control (68 pages)
- REAX top (44 pages)
- REAX 2 (48 pages)
- REAX 20 (54 pages)
- Multi Reax (60 pages)
- TITRAMAX 100 / 101 / 1000 (60 pages)
- UNIMAX 1010 (68 pages)
- UNIMAX 2010 (72 pages)
- Pump drives (198 pages)
- SilentCrusher M (146 pages)
- SilentCrusher S (98 pages)