beautypg.com

Plumbing requirements (cont) – Bunn JDF-2 User Manual

Page 5

background image

5

shape of the hole(s) made in the supply line(s) by saddle valves may restrict water flow.

Note- A water strainer (Bunn-O-Matic part number 23720.1000) should be installed in line, prior to the

flexible water line. This strainer is supplied loose with the dispenser. (See Fig. 2 for proper locations)

This equipment must be installed to comply with the Basic Plumbing Code of the Building Officials and
Code Administrators International, Inc. (BOCA) and the Food Service Sanitation Manual of the Food and
Drug Administration (FDA).

INITIAL FILL

CAUTION: The dispenser must be disconnected from the power source throughout the initial fill except when
specified in the instructions.

1. Remove drip tray assembly and splash panel from the dispenser.
2. Pull the overflow tube from its retaining clip and connect it to the main water source (black gasket is supplied

in install kit).

3. Slowly open the water shut off valve and fill the water bath until water trickles from the overflow.
4. Connect dispenser to the power source.
5. After 3 minutes of power, slowly add more water to the tank until water trickles from overflow again.
6. Once water bath is filled, remove water source, cap dispenser fill line, and store the fill tube in it’s holder (the

fill tube can now be used as a sight glass).

7. Replace the splash panel and drip tray.
8. Place refrigeration switch to the “ON” position. It will take approximately three hours at 75

°

F (24

°

C) ambient

to create the ice bank required for full dispenser performance. During this time, some further trickling from
the water bath is expected due to expansion caused by ice bank formation. While the refrigeration system is
creating the ice bank, the dispenser may be readied for use as described in

Plumbing, Loading, Priming

and

Adjustment.

PLUMBING REQUIREMENTS (cont)

35303 012703

FIG 1 Initial Fill Connection

P2655