beautypg.com

Bunn VLPF User Manual

Page 24

background image

Page 24

Location:

The Right switch is located in the front of the hood,

above and to the right of the brew funnel.

Test Procedure:
1. Disconnect the brewer from the power source and

remove the wires from all three terminals of the
Right switch.

2. With a voltmeter, check the voltage across the

black and white wires. Connect the brewer to the
power source. The indication must be 120 volts
ac.

3. Disconnect the brewer from the power source.

If voltage is present as described, proceed to #4.
If voltage is not present as described, refer to the

Wiring Diagram

and check the brewer wiring harness.

4. Check for continuity across the two terminals on

the left side of the switch when it is in the upper
position. Continuity must not be present across
these terminals in the lower position.

WHI Tank Keep Warm Heater Lead
WHI to On/Left Switch
WHI to Solenoid

WHI Tank Keep Warm Heater
Lead
BLK to On/Left Switch

BRN/BLK to Right De-
canter Warmer

FIG. 19 RIGHT SWITCH TERMINALS

P1987

RIGHT SWITCH

SERVICE (cont.)