beautypg.com

Bunn VLPF User Manual

Page 13

background image

Page 13

SERVICE

This section provides procedures for testing and

replacing various major components used in this
brewer should service become necessary. Refer to

Troubleshooting

for assistance in determining the

cause of any problem.

COMPONENT ACCESS

WARNING - Unplug the brewer before the removal of
any panel or the replacement of any component

The On/Left switch, Start switch, Right switch,

solenoid valve, brew timer, liquid level control com-
ponents, relay, control thermostat, limit thermostat,
and tank heater are located in the hood. Access is
gained by removing the top lid, attached with two #4-
40 slotted-head screws.

WARNING - Inspection, testing, and repair of electri-
cal equipment should be performed only by qualified
service personnel. The brewer should be unplugged
when servicing, except when electrical tests are re-
quired and the test procedure specifically states to
plug in the brewer.

CONTENTS

Brew Timer .................................................... 14
Control Thermostat ........................................ 17
Decanter Warmer(s) ...................................... 18
Limit Thermostat ........................................... 19
Liquid Level Control System .......................... 20
On/Left Warmer Switch ................................. 22
Relay.............................................................. 23
Right Warmer Switch .................................... 24
Solenoid Valve ............................................... 25
Start Switch ................................................... 26
Tank Heater .................................................... 27
Wiring Diagram ............................................. 28