Operating instructions safety switch ces-ap-c.2-ch, Connection – EUCHNER CES-AP-CL2-CH (Multicode) User Manual
Page 13

Operating Instructions Safety Switch CES-AP-C.2-CH
13
Connection
Connect the device as shown in Figure 3. The OUT output can be connected to a
control system as a monitoring output.
Important:
The subsystem CES-AP complies with PL e in accordance with EN 13849-1. To
integrate the subsystem in a category 3 or 4 structure, it is necessary to monitor
the downstream load (the feedback loop must be monitored).
These examples show only an excerpt that is relevant for connection of the CES
system. The example illustrated here does not show complete system planning.
The user is responsible for safe integration in the overall system.
GND
DC 24 V
-F1
CES-AP-C.2-...
UB
1
O
A
2
O
B
4
N
C
6
M8 plug-connector
(6-pin)
O
UT
5
0V
3
-V1
-K1
-V2
-K2
L1
M
3
~
-M1
L2
L3
Fig. 3: Connection example CES-AP-CR2-CH/CES-AP-CL2-CH