ETC Sensor SR24-48 Sssh User Manual
Sensor sound suppression hood (sssh) upgrade, Electronic theatre controls, Preparing to install the hood and acoustic pad
Table of contents
Document Outline
- Sensor sound suppression hood (Sssh) upgrade
- Preparing to install the hood and acoustic pad
- 1. Shut off rack power at the main circuit breaker.
- 2. Remove dust from the top of the rack and the wall behind it with a vacuum or damp rag.
- 3. Remove any oil or grease residue from the area with a mild detergent or degreaser solution and...
- 4. Without exposing the adhesive strips, position the hood and acoustic pad as shown below.
- Figure 1 : Positioning the hood and pad before installation
- Installing the hood and acoustic pad
- 1. Expose the adhesive strips on the back of the hood, except in the marked areas where conduit i...
- Figure 2 : Exposing the adhesive
- 2. Bend the ends of the pad forward so the exposed adhesive doesn’t touch the wall and slide the ...
- 3. Trim off any sections of the velcro strip on the bottom of the hood that would press against a...
- 4. Remove the covers to expose the adhesive strips on the bottom of the hood.
- 5. Position the front edge of the hood against the top bolts in the front of the dimmer cabinet a...
- 6. Installation is complete. Allow the hood and pad to stay in place for 30 minutes to completely...
- Figure 3 : Installing the hood and pad
- Preparing to install the hood and acoustic pad