Chapter 5: installation, Unpacking the drive components, Chapter 5 – ElmoMC Gold Line Digital Servo Drives-Gold DC Bell User Manual
Page 12: Installation
Gold DC Bell Installation Guide
MAN-G-DCBELIG-EC (Ver. 1.200)
||Unpacking the Drive Components
12
Chapter 5:
Installation
The Gold DC Bell must be installed in a suitable environment and properly connected to its voltage
supplies and the motor.
5.1. Unpacking the Drive Components
Before you begin working with the Gold DC Bell, verify that you have all of its components, as
follows:
•
The Gold DC Bell servo drive
•
The Elmo Application Studio software and software manual
The Gold DC Bell is shipped in a cardboard box with Styrofoam protection.
To unpack the Gold DC Bell:
1.
Carefully remove the servo drive from the box and the Styrofoam.
2.
Check the drive to ensure that there is no visible damage to the instrument. If any damage
has occurred, report it immediately to the carrier that delivered your drive.
3.
To ensure that the Gold DC Bell you have unpacked is the appropriate type for your
requirements, locate the part number sticker on the side of the Gold DC Bell. It looks like
this:
4.
Verify that the Gold DC Bell type is the one that you ordered, and ensure that the voltage
meets your specific requirements.
The part number at the top provides the type designation. Refer to the appropriate part
number in the section Catalog Number at the beginning of the installation guide.