Elkhart Brass UBEC 1AT AUTO TANK Fill System User Manual
Page 7

7
INSTALLATION INSTRUCTIONS
TankVision Display Module
Note: It is recommended to mount the display at eye level for accurate tank level readings.
1. Measure and mark mounting location for display module panel cutout and mounting screw holes.
Make sure there is a clearance behind the panel for the display and cables before cutting holes.
Refer to Figure 2 below.
2. Cut out a 4” by 2 1/8” hole and drill four (4) holes (clearance or tapped) for 6-32 mounting
screws.
3. Place Display Module in position and secure with four (4) screws.
4. Connect the Display Module cables and wires. (Please refer to Wiring Section on page 17)
Figure 2: Display Module Dimensions
See also other documents in the category Elkhart Brass Equipment:
- HEROPipe System Manual (17 pages)
- HEROPipe System Setup Guide (9 pages)
- Ball Shut-offs & Playpipes DB & B-375-A, GA, AT, & GAT (3 pages)
- CHIEF NOZZLES 4000-02, 03 (2 pages)
- TFLX Label Placement (1 page)
- FLX-20G (10 pages)
- TFLX-20 (10 pages)
- Brief Bumper (2 pages)
- Detailed Bumper (2 pages)
- SFL-CG-95 (2 pages)
- SFL-GN-95-SPL (2 pages)
- SFL-GN-95 (8 pages)
- SFL-GN-125 (8 pages)
- SELECT-O-FLOW NOZZLES SFS & SFS-G / SFL, SFL-G & TSFL / SFM, SFM-G & TSFM SF, DSF & TSF (2 pages)
- SFL-BG (RNZN) (6 pages)
- SELECT-O-MATIC NOZZLES SM-3F, SM-3FG / SM-10F, SM-10FG, TSM-10F SM-20F, SM-20FG, TSM-20F SM-30F, SM-30FG, DSM-30F, TSM-30F (2 pages)
- SS-475GAAT (8 pages)
- Foam Expansion Tubes 244, 246, 247, 244-S, 246-S, & 247-S (1 page)
- 242-95 portable eductor (2 pages)
- Cobra 7200 EXM Monitor (42 pages)
- Cobra 7250 EXM Monitor (42 pages)
- RAM Personal Portable Monitor (15 pages)
- Scorpion 7400 EXM Monitor (40 pages)
- Sidewinder 8494 Monitor (28 pages)
- Sidewinder 7100 EXM Monitor (42 pages)
- Sidewinder EXM Quick Install Guide (4 pages)
- Vulcan 8500-xx (16 pages)
- 8287 Three-Inlet Portable Monitor (6 pages)
- Cobra EXM Light Kit (8 pages)
- Cobra EXM Quick Install Guide (4 pages)
- Copperhead 8593-IV (17 pages)
- Copperhead Monitor Quick Install Guide (3 pages)
- Vulcan 8500-xx EXT (32 pages)
- Copperhead 8593-04 Monitor (23 pages)
- 7095 EXM CAN Stow Module (4 pages)
- ELKHART 299-20 GIANT PYTHON (1 page)
- ELKHART 299-11 EL (10,15,20FT) (3 pages)
- ELKHART 299-11 EL (25,30,40FT) (4 pages)
- ELKHART 299-11 EL (40-Ft 750-GPM) (3 pages)
- ELKHART 8394-02 RC (4 pages)
- ELKHART 294-11-CW (10 pages)
- Extender 8598 (22 pages)
- Python 299-11 (12 pages)
- Oscillating_RAN 3890 (12 pages)
- Scorpion 8294-04 (25 pages)