COBRA EXM
QUICK START GUIDE: 98000000 REV. REL
Step 1. Mount Monitor onto base
Step 2. Attach Nozzle to Monitor
Step 3. Confirm Connections
Install monitor to flange using 5/8”-11
UNC Grade 5 bolts and nuts. Tighten
uniformly (20 lb increments) to 60-70ft/lb
using Loctite 242 or equivalent.
MOUNT MONITOR - FLANGE
P/N 98491100 Rev C
Thread monitor onto base using Loctite
592 thread sealant or equivalent.
Tighten using strap wrench on hex
portion of monitor base.
MOUNT MONITOR - THREADED
Install a 20A fuse (12VDC) into the
positive power lead; 10A fuse for 24VDC.
SUPPLY POWER - FUSE
Position monitor discharge elbow parallel
to the ground. Ensure gasket is inside
nozzle swivel before installing.
Confirm that all connections are tight and all electrical connections have been reconnected. If installing additional
components, such as controllers, you may choose to double check the connections after everything has been installed.
POSITION DISCHARGE
Hand tighten nozzle to monitor using
swivel. Position actuator assembly about
90° as shown above.
POSITION NOZZLE ACTUATOR
Tighten swivel using a spanner wrench to
ensure a secure connection.
TIGHTEN NOZZLE
Connect nozzle & monitor two-way
connectors.
CONNECT POWER
Quick Install Guide
COBRA EXM
TM
16g
Gasket or
Sealant
90°
0°
90°