Barranca Diamond SUPER CABMAKER-GP8 User Manual
Page 12

12
PRE-START
Check all four motor mount bolts (Fig 3) to make sure they are tight.
Fig 1 - Front motor mount bolts
Fig 2 - GFCI
Fig 3 - Power switch in the
OFF position
Fig 4 - GFCI reset button
SUPER CABMAKER GP8
OPERATION AND ADJUSTMENT
START-UP
Place the GP-8 Super Cabmaker on a strong flat table or bench. A power test can now be conducted
to make sure the motor is operating and all moving wheels and blades are correctly aligned and
secured to the main shaft. Plug the enclosed Ground Fault Circuit Interrupter (GFCI) into a 110 to 120
volt 60 Hz minimum 15 amp circuit wall outlet (Fig 2).
If needed, plug an extension cord into the GFCI. If an extension cord is used, refer to Table 1 on page
8 for the correct AWG size. The GP-8 Super Cabmaker power cord is attached to the ON/OFF switch
box on the right side of the unit. Make sure the switch box lever is in the OFF (Fig 3) position before
plugging into the GFCI or extension cord.
To energize and test the GFCI, push the RESET button (Fig 4) on the switch and a red window will
appear to indicate the switch is energized. If the TEST button is pushed, the switch will click off indi-
cating the GFCI is functioning correctly. Push the reset button again to re-energize the GFCI.