beautypg.com

Installation instructions, Figure 11 cable threading diagram – Autoquip VERTICAL RAM LIFTS - DUAL RAM User Manual

Page 25

background image

25

OPEN SOCKET

FOR CABLE A

SHEAVES

EXTRA HEAVY

OIL LINE COUPLING

RAM DUAL

OPEN SOCKET

FOR CABLE B

PIT CHANNEL

EQUALIZER STRUT

STRUT TUBE

CABLE B

CABLE A

CABLE A

CABLE B

CABLE A

CABLE B

CABLE B

THIMBLE

EYE BOLT

THIMBLE

CABLE CLIPS

CABLE A

(TYP)

RAM

CL

TO

CL

Figure 11 Cable Threading Diagram

INSTALLATION INSTRUCTIONS

This manual is related to the following products: