Installation instructions, Figure 9 general arrangement - ape – Autoquip VERTICAL RAM LIFTS - DUAL RAM User Manual

Page 23

background image

23

OIL LINE TO RUN BEFORE

SECTION "A-A"

STEEL CASING, IF REQUIRED

3 6 " DIA. X 1 /4 " WALL

( BY PIT CONTRACTOR)

FOOTING

REINFORCING BAR

CLEAN SAND BACKFILL
(BY INSTALLER)

WELDED TO CASING
(BY PIT CONTRACTOR)

CONCRETE BUMPERS

( BY OTHERS)

TYP. ( 4) CORNERS

9 " ROUND OR SQUARE OPENING

CONCRETE IS POURED.

FOR SETTING NON-ROTATOR
(BY OTHERS).

UNION

3 6 " ROUND OR SQUARE OPENING IN
PIT FLOOR FOR SETTING RAM.

PLATFORM LENGTH

PIT LENGTH

(PLATFORM LENGTH + 2 " )

CENTER OF PLATFORM

PIT DEPTH

3 6 " APPROX.

TRAVEL

LIFT

BLACK STRIPED TAPE.

SIDES WITH YELLOW AND

BEVEL TOE GUARDS ON ( 4)

HANDRAILS AND

SNAP CHAINS NOT

SHOWN FOR CLARITY.

" A "

TYP.

1 8 "

RAM LOCATED IN

1 8 "

TYP.

LOCATE WHERE CONVENIENT.

REMOTE POWER UNIT:

TOP OF RAM FLANGE.

1 3"

RAM SETTING DIM.

FROM FLOOR LEVEL TO

RAM LENGTH

PIPE CHASE

(BY OTHERS)

UNION

CURB ANGLES

(BY OTHERS)

NON-ROTATOR ASS,Y.

ELBOW

1 " TYP.

1 " TYP.

WIDTH + 2 " )

(PLATFORM

WIDTH

PIT

1 2 "

WASHER PLATE
& RAM BOLTS

CONCRETE BUMPERS

( 4 ) CORNERS
( BY PIT CONTRACTOR)

WIDTH

PLATFORM

" A "

Figure 9 General Arrangement - APE

INSTALLATION INSTRUCTIONS