Installation instructions, Figure 10 general arrangement – drape – Autoquip VERTICAL RAM LIFTS - DUAL RAM User Manual
Page 24
24
CONCRETE IS POURED
OIL LINE TO RUN BEFORE
(BY PIT CONTRACTOR)
(BY PIT CONTRACTOR)
PIPE CHASES
CONNECTING PIPE
REMOTE POWER UNIT
LOCATE WHERE CONVENIENT
( BY PIT CONTRACTOR)
CLEAN SAND BACKFILL
(BY INSTALLER)
REINFORCING BAR
WELDED TO CASING
(BY PIT CONTRACTOR)
3 6" APPROX.
(BY PIT CONTRACTOR)
STEEL CASINGS
4 2" X 42" X 1 / 4" WALL
PIT DEPTH
SECTION " A- A "
FOOTING
TIE ROD
RAM
RAM LENGTH
FOOTING
UNION
" A "
HANDRAILS AND
SNAP CHAINS NOT
SHOWN FOR CLARITY.
1" TYP.
LIFT
TRAVEL
(PLATFORM WIDTH + 2")
PIT WIDTH
" A "
RAM SETTING DIM
TO TOP OF RAM FLANGE
(BY PIT CONTRACTOR)
CONCRETE BUMPERS
RAM WASHER
BLACK STRIPED TAPE.
BEVEL TOE GUARDS ON ( 4)
SIDES WITH YELLOW AND
1 " TYP.
PLATE
( 4) CORNERS
RAM C.L.
ELBOW
UNION
CURB ANGLES
"
(PLATFORM LENGTH + 2" )
" PIT LENGTH
18"
TYP.
18"
TYP.
Figure 10 General Arrangement – DRAPE
INSTALLATION INSTRUCTIONS