beautypg.com

Installation instructions, Warning – Autoquip PLD DOCK LIFT User Manual

Page 15

background image

15

Leveling to Grade

1. The platform top should be solid and flush with the pit curb angles. The pit depth

includes _” added to the lowered height of the lift for leveling purposes (see Figure
8).

2. Fully lower the lift platform into the pit and check for proper height.

3. Shims and/or grout must be placed under the entire base frame assembly and the

platform support members to support the platform top at grade level. DO NOT “spot”
shim! Shims and/or grout must be able to support the lift base frame while loaded at
full rated lifting capacity and rollover load.

Final Preparation

1. To remove (bleed) air from the cylinders, fully lower the lift and hold the “DOWN”

button for 30 to 40 seconds. Cycle the lift 10 to 15 times and repeat the process by
fully lowering the lift and holding the “DOWN” button 30 – 40 seconds.

2. Raise lift slightly to clear the maintenance locks.

3. Carefully loosen the bleeder screw plug at the top end of the ram casing to remove

trapped air from the ram.

WARNING!

DO NOT REMOVE BLEED SCREW! This could cause the lift to drop
rapidly, resulting in damage or personal injury.

4. Check the oil level of reservoir with the lift in the fully lowered position. Oil should be

approximately _” below the top of the reservoir tank. (See the “Maintenance” section
for oil specifications.)

5. Make sure that all applicable labels are in place in accordance to Figure 1.

WARNING!

All

DANGER,WARNING, and CAUTION labels and

informational decals and plates must be intact and in place on the lift.
Contact an Autoquip representative if labels are missing or damaged

.

INSTALLATION INSTRUCTIONS