Installation instructions, Danger – Autoquip DOUBLE PANTOGRAPH LIFT User Manual
Page 23
23
DANGER
!
Do not work under the lift without use of the Maintenance Device!
To avoid personal injury, NEVER go under the lift platform until the
load is removed and the scissors mechanism is securely blocked
in the open position and the appropriate OSHA lock-out/tag-out
procedure is followed. See "Lift Blocking Instructions" section.
6. The base frame of the lift has pre-drilled holes for lagging it securely to the floor.
Mark the holes, drill, and install with anchors. Lifts with oversize platforms have
minimum pull out requirements of 2,000 lbs. for each anchor.
7. Make permanent electrical connections and operate the lift through a few cycles.
REMOTE POWER UNIT INSTALLATION:
1. The remote power unit is to be located in an area protected from the elements and
should be installed prior to the lift to facilitate lift operation during installation into the
pit.
2. The remote contractor power unit is equipped with power unit mounting brackets and
can be wall or floor mounted using these brackets. If equipped with a vertical power
unit, optional power unit mounting brackets must be used for wall mounting.
(Contact Autoquip for optional 'vertical power unit' brackets).
3. The electrical work is to be done in accordance with local codes by a qualified
electrician. See the “General Maintenance” section for the standard wiring diagram.
4. If permanent electrical work is not complete, some means of temporary power with
an on/off device for the motor will be required.
5. Fill the reservoir with oil per instructions in the "Routing Maintenance” section.
INSTALLATION INSTRUCTIONS