3 installation site preparation – AirLive POE-FSH808AT User Manual
Page 12

2. Installation of the Switch
AirLive POE-FSH808AT User’s Manual
7
Reset:
The Reset button is to reset all the setting back to the factory default.
* Note: Be sure that you recorded the setting of your device, else all the setting will be
erased when pressing the “
Reset” button.
2.2.2 Rear Panel
The 3-pronged power plug and on/off switch are placed at the rear panel of the switch right
side shown as below.
2.3 Installation Site Preparation
You can mount POE-FSH808AT either on desktop or on a 19-inch rack. If you plan to
mount the switch on desktop, please choose a steady, level surface in a well-ventilated
area that is free from excessive dust. In any case, the installation site chosen for your
switch has to comply with the following requirements:
The surface where you want to mount the switch must be able to sustain at least 1.5kg.
Do not place heavy objects (more than 3kg) on top of the switch.
The location must preferably be free from excessive dust, away from heat vent, hot-air
exhaust and direct sunlight.
The switch should not be placed near large electric motors or other strong
electromagnetic sources. As a reference, the strength of the electromagnetic field on
site should not exceed the (RFC) standards for IEC 801-3, Level 2(3V/M) field strength.
The air temperature in the location should be within a range of 0 to 65°C.