3 operational readiness check, 4 plc switch, 5 status displays – ADS-TEC BPC1000 User Manual
Page 15: 6 plc led (two colors), Industrial pcs bpc1000

Industrial PCs BPC1000
© ads-tec GmbH • Raiffeisenstr.14 • 70771 Leinfelden-Echterdingen
15
4.3 O
PERATIONAL READINESS CHECK
•
Connect the power cable to the power source.
•
Check the device to determine whether damages have been caused by improper
transport, incorrect operation or storage conditions or improper handling (e.g.
smoke emission from the device, etc.). If damages are found, immediately shut
down the device and protect it against unintentional startup.
4.4 PLC
SWITCH
The PLC switch is located underneath the cover at the front of the device.
The PLC software can be controlled by using the PLC switch. The function of individual
switch positions may vary depending on the software and PLC version used. Additionally,
you can read current status information by using the keys.
E
XAMPLE
:
SWITCH POSITION
DESCRIPTION
RUN / PROG:
Run or programming status
STOP:
PLC is stopped
MRESET:
The PLC is reset
4.5 S
TATUS DISPLAYS
SYS
LED
(
BICOLOURED
)
Depending on the colour and type of flashing different device states are displayed by the
SYS LED.
The following signals are displayed:
•
LED lights green
The device is ready for operation (Power ON).
•
LED flashes red
Environmental temperature too high.
•
LED is off
The device is switched off. (POWER OFF)
4.6 PLC
LED
(
TWO COLORS
)
This LED indicates the status of a soft PLC. A soft PLC has to be installed in order for this
LED to display various signals. Various device statuses are indicated by the colors and
flashing patterns of the PLC LED.