4 commissioning, 1 available interfaces, 2 cable installation – ADS-TEC OPC7013/7015/7022 User Manual
Page 23: 3 order of steps during commissioning, Ommissioning

Industrial PCs OPC7013/7015/7022
© ads-tec GmbH • Raiffeisenstr.14 • 70771 Leinfelden-Echterdingen
23
4
C
OMMISSIONING
Warning:
The PC must be switched off before connecting or disconnecting any cables in order to
prevent damage to the electronics!
The device may only be switched on after acclimatising to the ambient temperature in
order to avoid condensate accumulation.
Make sure to meet the permissible voltage requirements for this device.
After switching off and before switching on you must wait for at least 5 seconds.
4.1
A
VAILABLE INTERFACES
The devices have the following interfaces by default:
Note:
The screen of a data cable must always be connected with the connector housing (EMC).
Under the embedded operating system, interfaces must explicitly be enabled and required
drivers must be installed in order to be able to use them.
Pos : 19 /D atent ec hni k/I nbetri ebnahme/ Kabelmont age/ Kabelmont age für OPC 7000-Serie @ 2\ mod_1271079309582_6.doc @ 7602 @
4.2
C
ABLE INSTALLATION
The interfaces as well as power supply plugs for the device are accommodated in the
device service slot.
Pos : 20 /D atent ec hni k/I nbetri ebnahme/R eihenfolg e der Inbetriebnahme/R ei henf olge der I nbetriebnahme f ür O PC 7000- Seri e @ 2\ mod_1271079348034_6. doc @ 7606 @
4.3
O
RDER OF STEPS DURING COMMISSIONING
•
With 24V DC devices: Connect the power supply
cable with the terminals by using cable end sleeves
•
Connect cable for serial / parallel data transmission and fasten the screws between
the connector plug and socket
•
Plug in all other required cables and protect from accidental disconnection
Pos : 21 /D atent ec hni k/I nbetri ebnahme/ Betriebsberei tschaf t prüf en/ Betriebsbereit schaf t prüf en f ür O PC/C PC/ PLC /OTC /ITC/ VMT-Serie(+Monit ore) / I PC 5100/ 5500/ 2400/1100 @ 0\ mod_1158905578361_6. doc @ 381 @