beautypg.com

Machine inspection, 3 operation, General – JLG 67SL Operator Manual User Manual

Page 13: Machine inspection -3, Operation -3, General -3, 3 operation general

background image

SECTION 1 - SAFETY PRECAUTIONS

3121321

– JLG Lift –

1-3

Machine Inspection

• Do not operate this machine until the inspections and

functional checks have been performed as specified in
Section 2 of this manual.

• Do not operate this machine until it has been serviced and

maintained according to the maintenance and inspection
requirements as specified in the machine’s Service and
Maintenance Manual.

• Ensure all safety devices are operating properly. Modifica-

tion of these devices is a safety violation.

MODIFICATION OR ALTERATION OF AN AERIAL WORK PLATFORM
SHALL BE MADE ONLY WITH PRIOR WRITTEN PERMISSION FROM THE
MANUFACTURER

• Do not operate any machine on which the safety or

instruction placards or decals are missing or illegible.

• Check the machine for modifications to original compo-

nents. Ensure that any modifications have been approved
by JLG.

• Avoid accumulation of debris on platform deck. Keep

mud, oil, grease, and other slippery substances from foot-
wear and platform deck.

1.3

OPERATION

General

• Do not use the machine for any purpose other than posi-

tioning personnel, their tools, and equipment.

• Before operation, the user must be familiar with the

machine capabilities and operating characteristics of all
functions.

• Never operate a malfunctioning machine. If a malfunction

occurs, shut down the machine. Remove the unit from
service and notify the proper authorities.

• Do not remove, modify, or disable any safety devices.

• Never slam a control switch or lever through neutral to an

opposite direction. Always return switch to neutral and
stop before moving the switch to the next function. Oper-
ate controls with slow and even pressure.

• Do not allow personnel to tamper with or operate the

machine from the ground with personnel in the platform,
except in an emergency.

• Do not carry materials directly on platform railing unless

approved by JLG.

• When two or more persons are in the platform, the opera-

tor shall be responsible for all machine operations.