JLG 2505H Operator Manual User Manual
Page 103
Section 5 - Attachments and Hitches
5-27
31200743
Operation:
• Raise or lower boom to appropriate height and open grapple for loading material
from stockpile.
• Align telehandler with face of stockpile and drive slowly and smoothly into pile to
load bucket.
• Tilt bucket up far enough to retain load, close grapple, and back away from pile.
• Travel in accordance with requirements set forth in Section 1 - General Safety
• Open grapple and tilt bucket down to dump load.
Equipment Damage Precautions:
• Except for lifting or dumping a load, the boom must be fully retracted for all
bucket operations.
• Do not corner-load bucket. Distribute material evenly within the bucket. Bucket
capacity charts are for evenly distributed loads only.
• Do not use bucket as a lever to pry material. Excessive prying forces could
damage bucket or machine structure.
• Do not attempt to load material which is hard or frozen. This could cause severe
damage to quick attach or machine structure.
• Do not use bucket for "back dragging." This could cause severe damage to quick
attach.