Hydraulic operated attachment, Platform attachment (if equipped) – JLG 40xxPS Operator Manual User Manual
Page 98

Section 5 - Attachments and Hitches
5-18
31200205
Hydraulic Operated Attachment
1. Install attachment (see page 5-11 or 5-16).
2. Lower attachment to ground.
3. Quickly depress and release continuous auxiliary hydraulics switch (1) twice.
Depress again and hold to relieve pressure at both auxiliary fittings (2).
Note: Depressing of auxiliary hydraulics switch three times must be accomplished
within two seconds. If buzzer sounds or continuous auxiliary hydraulics indicator
illuminates, repeat step 3.
4. Perform “Shut-Down Procedure” on page 4-3.
5. Connect attachment hoses to both auxiliary fittings.
Platform Attachment (If Equipped)
1. Install platform (see page 5-11) and connect hydraulic lines (see above).
2. With the park brake applied and engine off, remove connector cover (3) and
connect electric cable (4) from the platform.
OZ2220
2
OZ0632
1
OZ2861
3
4