General -13, Daily walk-around inspection - sheet 3 of 4 -13, General – JLG 1500SJ Operator Manual User Manual
Page 41

SECTION 2 - USER RESPONSIBILITIES, MACHINE PREPARATION, AND INSPECTION
3121261
– JLG Lift –
2-13
General
Begin the "Walk-Around Inspection" at Item 1, as noted on the
diagram. Continue checking each item in sequence for the con-
ditions listed in the following checklist.
TO AVOID POSSIBLE INJURY, BE SURE MACHINE POWER IS OFF.
DO NOT OPERATE MACHINE UNTIL ALL MALFUNCTIONS HAVE BEEN CORRECTED.
INSPECTION NOTE: On all components, make sure there are no
loose or missing parts, that they are securely fastened, and no visi-
ble damage, leaks or excessive wear exists in addition to any other
criteria mentioned.
1.
Platform Assembly and Gate - Footswitch works prop-
erly, not modified, disabled or blocked. Gate latch and
hinges in working condition.
2.
Platform & Ground Control Consoles - Switches and
levers return to neutral, decals/placards secure and legible,
control markings legible.
3.
Boom Sections/Turntable - See Inspection Note.
4.
Swing Drive - No evidence of damage.
5.
Wheel/Tire Assemblies - Properly secured, no missing lug
nuts. Inspect for worn tread, cuts, tears or other discrepan-
cies. Inspect wheels for damage and corrosion.
6.
Drive Motor, Brake, and Hub - No evidence of leakage.
7.
Hood Assemblies - See Inspection Note.
8.
Auxiliary Hydraulic Pump - See Inspection Note.
9.
All Hydraulic Cylinders - No visible damage; pivot pins
and hydraulic hoses undamaged, not leaking.
10.
Turntable Bearing - Evidence of proper lubrication. No
evidence of loose bolts or looseness between bearing and
machine.
11.
Steering Spindles and Sensors - See Inspection Note.
Figure 2-6. Daily Walk-Around Inspection - Sheet 3 of 4