Burnham V7 SERIES User Manual
Page 17

17
Lift "H"
(See Fig. 16)
Maximum Length of Tubing
"H" + "R" (See Figure 16)
3/8" OD
Tubing (3 GPH)
1/2" OD
Tubing (3 GPH)
0'
93'
100'
2'
85'
100'
4'
77'
100'
6'
69'
100'
8'
60'
100'
10'
52'
100'
12'
44'
100'
14'
36'
100'
16'
27'
100'
18'
---
76'
TABLE 5: TWO-STAGE UNITS (3450 RPM) -
TWO-PIPE SYSTEMS
Figure 15
TABLE 4: SINGLE-STAGE UNITS (3450 RPM) -
TWO-PIPE SYSTEMS
Lift "H"
(See Fig. 16)
Manimum Length of Tubing
"H" + "R" (See Figure 16)
3/8" OD
Tubing (3 GPH)
1/2" OD
Tubing (3 GPH)
0'
84'
100'
1'
78'
100'
2'
73'
100'
3'
68'
100'
4'
63'
100'
5'
57'
100'
6'
52'
100'
7'
47'
100'
8'
42'
100'
9'
36'
100'
10'
31'
100'
11'
26'
100'
12'
21'
83'
13'
---
62'
14'
---
41'
Figure 16
IMPORTANT
Single-pipe installations must be absolutely
airtight or leaks or loss of prime may result.
Bleed line and fuel unit completely.
See also other documents in the category Burnham Water boiler:
- 81433101R16-1/10 (40 pages)
- Gas-Fired (4 pages)
- Independence IN8 (1 page)
- Independence IN9 (92 pages)
- ALP105 (100 pages)
- 53A (22 pages)
- CHG150 (72 pages)
- Series 2B (52 pages)
- LEDV-3 (1 page)
- ALP399 (3 pages)
- MST513 (4 pages)
- HF SERIES (28 pages)
- SL AL119SL (1 page)
- PVG (64 pages)
- Independence PV (6 pages)
- V9A (64 pages)
- SERIES 3 1099-01R1-/10 (8 pages)
- RSA (52 pages)
- E4 (8 pages)
- SCG 1100-H4 (96 pages)
- SERIES 2 (6 pages)
- MEGASTEAM MST396 (68 pages)
- V9 (4 pages)
- LE L7248 (28 pages)
- LEDV SERIES (36 pages)
- MST396 (64 pages)
- ES2 (52 pages)
- ALP080 (7 pages)
- Minuteman II (6 pages)
- PVG & SCG (4 pages)
- V8 Series (100 pages)
- FCM120 (80 pages)
- Carefree DOE (3 pages)
- 20_PV_I (32 pages)
- BOILERS (48 pages)
- MPO Series (4 pages)
- V8H Series (2 pages)
- 8H (92 pages)
- SM-6 (28 pages)
- SCG (92 pages)
- CHG (4 pages)
- ALPINE (8 pages)
- MULTI-PASS (108 pages)
- C4 SERIES (2 pages)