beautypg.com

Assembly following cleaning – Bunn ULTRA-1 User Manual

Page 15

background image

15

1. Install the seal(s) over the flange at

the rear of the cooling drum(s) and

press the seal(s) firmly into place

as shown.

2. Align the auger shaft(s) with the

auger(s). Push the auger(s) as far as

they will go and rotate so the flat face

of the auger shaft is aligned with the

flat face of the auger nose.

4. Thoroughly rinse the hopper(s)

and install over the auger(s) and

cooling drum(s).

6. Set the lids on the hopper(s)

and plug in the hopper lid lamp

cord(s).

10. Assemble the drip tray.

8. Slide the faucet valve assembly into

place on the hopper.

9. Press down on the valve to com-

press the spring. Position the faucet

handle over the faucet valve one

side at a time and snap into place

on the hopper.

7. Position the faucet seal and return

spring in the faucet valve.

5. Slide into place and push down until

the hopper lock plunger(s) snap

into place. On models with autofill,

reconnect fill hoses and level probe

to hopper.

ASSEMBLY FOLLOWING CLEANING

3. Install auger nose bushing into

inside front of hopper.

40563 042910

11. Turn ON augers and cooling function

to desired settings.