JB Conversions 16-1200 HD Standard Length SYE Kit for the NP231 User Manual
Page 10

10
FIG: 19
16) Apply a thin bead of RTV to the gasket area on the rear case.
Apply a small amount of RTV to the threads of the original 8mm bolts.
Install the new bearing housing onto the case using the original 8mm
bolts (Fig.20).
FIG: 20
17) Install the rubber "star" washer seal onto the rear output shaft
(Fig.21). Torque the nut to 180 lb-ft. to complete the housing
installation (Fig.22). Install the front output yoke, rubber "star"
washer, and locknut. Torque this locknut to 90 lb-ft.
FIG: 21 FIG: 22