Blk wht red grn, Blk grn wht red – J.P. Instruments Slim Line Gauges Installation Guide User Manual
Page 8

INSTALLING THE SLIM LINE® INSTRUMENT SERIES
PAGE 8 OF 14
REV
B
Terminate each wire with a crimp-on ring terminal, provided. The ring terminals may be crimped with a
“service-type” tool, however AMP part number 48518 crimp tool is recommended. Verify the quality of each
crimp with a sharp tug on the wire. The terminal should be impossible to pull off when crimped correctly.
shrink tubing
shrink tubing
ring terminal
Place a ¼ x 4 inch sleeve over each pair of wires in the wiring. Connect the wire ring lug to the probe ring lug
using the supplied number 4 screws and nuts, placing the star washer between the ring lugs, not against the nut.
Important: place star waster between two ring
terminals and tighten nut and bolt as
necessary
to instrument
to probe
Slide the sleeve over the joint and secure with three tie-wraps.
1/4 x 4" sleeve
tie-wrap 3 places
The most common installation problems are related to poor quality terminations.
19) MP Sensor Wiring
Use the four-conductor cable supplied with the kit. Plug the smaller connector onto the sensor.
to
Sensor
1
BLK
WHT
RED
GRN
to
MP
instrument
BLK
GRN
WHT
RED