beautypg.com

Fast & Fluid Giotto Compact User Manual

Page 19

background image

Fast & Fluid Management Srl

A Unit of IDEX Corporation

_______________________________________________________________________________________________

1155007C-it,en,fr.doc – 16/10/2003

19

11.- CONTAINER CLEANING

d)

Extract all paint from the containers

e)

Put inside about 1 liter water and let operate for about 15 minutes together with

the simultaneous action of the stirrers

f)

Empty completely the containers operating the pumps : in this way it is possible

to clean the containers, the pistons and the valve. If this operation should be

insufficient, extract completely the measuring rods, screw out the ring nut body,

extract the piston unit and remove the internal piston.

DIAGRAM 10

Clean all elements carefully and remount them (following the same instructions for the

dismounting and carrying them out in the opposite sequence).

g)

Dry carefully and fill again.

Start the machine following the instructions contained in " LOADING AND WORKING"

(Page 7)