Fast & Fluid Giotto Compact User Manual
Page 15
Fast & Fluid Management Srl
A Unit of IDEX Corporation
_______________________________________________________________________________________________
1155007C-it,en,fr.doc – 16/10/2003
15
5.- CONTROL
Operate the main switch (1) (DIAGRAM 4).The green led (3) will light : this means that the
electrical supply is connected.
Set the timer (2) with a time of about 5 minutes and check that the machine works correctly.
During this phase the turning table has to be rotated in all position, until it returns to the starting
point.
When the set time is over, the device will automatically stop.
In case of problems, extract the plug from the socket and ask for the intervention of a
technician.
DIAGRAM 4
6.- LOADING AND WORKING
Fill the canisters with the paint, following the instructions of the producers (formula).
During this phase pay particular attention, not to dirty the stirring shaft and the external parts of
the machine. (DIAGRAM 5).
DIAGRAM 5
Put the lids (1) onto the canisters (2), twist clockwise to fit and tighten the locking screw (3)
with the allen key provided (4). (DIAGRAM 6)