beautypg.com

Fast & Fluid Giotto Compact User Manual

Page 15

background image

Fast & Fluid Management Srl

A Unit of IDEX Corporation

_______________________________________________________________________________________________

1155007C-it,en,fr.doc – 16/10/2003

15

5.- CONTROL

Operate the main switch (1) (DIAGRAM 4).The green led (3) will light : this means that the

electrical supply is connected.

Set the timer (2) with a time of about 5 minutes and check that the machine works correctly.

During this phase the turning table has to be rotated in all position, until it returns to the starting

point.

When the set time is over, the device will automatically stop.

In case of problems, extract the plug from the socket and ask for the intervention of a

technician.

DIAGRAM 4

6.- LOADING AND WORKING

Fill the canisters with the paint, following the instructions of the producers (formula).

During this phase pay particular attention, not to dirty the stirring shaft and the external parts of

the machine. (DIAGRAM 5).

DIAGRAM 5

Put the lids (1) onto the canisters (2), twist clockwise to fit and tighten the locking screw (3)

with the allen key provided (4). (DIAGRAM 6)