Fitting procedure – ARB 5421110 User Manual
Page 5

Last Rev Date: 14/01/14
Page 5 of 8
Fitting instructions# 3787952
Copyright © 2005 by ARB Corporation Limited. All rights reserved, this document must not be reproduced without the express authority of ARB Corporation Ltd
FITTING PROCEDURE
5.
Place panel onto chassis making sure it sits
under the bulbar stone shield as shown.
Secure to vehicle using original hardware
removed earlier leaving all bolts finger tight.
Secure stone tray to UVP using M6 bolts
removed in step 1.
6.
120 PRADO. As per image place spacer
tube between stone shield and UVP. Secure
using M8 x 70mm socket head cap screws,
spring washers and flat washers. Leave
finger tight.
7.
120 PRADO. Secure rear of front UVP to
chassis using original bolts in the two rear
most mounting points only. Leave finger tight.
8.
ALL VEHICLES: Place 3 M8 cage nuts in
rear face of front panel.
STONE SHIELD
SPACER
FRONT UVP
USE REAR MOUNTING
HOLES ONLY
- RD153 (40 pages)
- RD139 (36 pages)
- RD93 (34 pages)
- RD101 (46 pages)
- RD100 (46 pages)
- RD104 (46 pages)
- RD103 (46 pages)
- RD102 (46 pages)
- RD105 (46 pages)
- RD125 (42 pages)
- RD117 (44 pages)
- RD116 (44 pages)
- RD113 (42 pages)
- RD147 (44 pages)
- RD109 (42 pages)
- RD158 (38 pages)
- RD158 (44 pages)
- RD166 (42 pages)
- RD168 (44 pages)
- RD115 (44 pages)
- RD80 (44 pages)
- RD82 (40 pages)
- RD81 (40 pages)
- RD119 (40 pages)
- RD99 (40 pages)
- RD83 (44 pages)
- RD84 (44 pages)
- RD132 (40 pages)
- RD05 (38 pages)
- RD12 (44 pages)
- RD114 (36 pages)
- RD40 (38 pages)
- RD197 (42 pages)
- RD94 (40 pages)
- RD44 (46 pages)
- RD85 (42 pages)
- RD127 (40 pages)
- RD128 (40 pages)
- RD138 (40 pages)
- RD20 (44 pages)
- RD32 (44 pages)
- RD110 (42 pages)
- RD106 (48 pages)
- RD107 (48 pages)
- RD136 (42 pages)