ARB RD119 User Manual
Page 3

Table of Contents:
1
1 Introduction
3
1.1 Pre-Installation Preparation
3
1.2 Tool-Kit Recommendations
4
2 Removing the Existing Differential
5
2.1 Vehicle Support
5
2.2 Differential Fluid Drain
5
2.3 Removing the Axles
6
2.4 Marking the Bearing Caps
6
2.5 Checking the Current Backlash Amount
7
2.6 Removing the Differential Carrier
8
3 Installing the Air Locker
9
3.1
Installing the Carrier Bearings
9
3.2
Re-Mounting the Ring Gear
10
3.3
Drilling and Tapping the Bulkhead Port
11
3.4
Checking for Assembly Clearance
12
3.5
Checking the Backlash
15
3.6
Assembling the Seal Housing
17
3.7
Profiling the Seal Housing Tube
19
3.8
Setting Up the Bulkhead Fitting
20
3.9
Bench Testing the Air Locker
22
3.10
Reinstalling the Differential and Axles
23
4 Installing the Air System
24
4.1 Mounting the Solenoid
24
4.2 Running & Securing the Air Line
26
4.3 Connection to the Bulkhead Fitting
27
5 Mounting & Connecting the Electrical System
29
5.1 Mounting the Actuator Switch(es)
29
5.2 Wiring the Actuator System
30
6 Testing & Final Assembly
34
6.1 Leak Testing
34
6.2 Testing the Air Locker Actuation
35
6.3 Re-Sealing & Filling the Differential
35
6.4 Post-Installation Check List
36
7 Parts List
37
7.1 Exploded Assembly Diagram
37
7.2 Itemized Parts List
38