Section head - maintenance procedures, Maintenance procedures – Fluid Management H-5 Mixer Mechanical Timer User Manual
Page 15

MAINTENANCE PROCEDURES
H-5 Paint Mixer Operating & Instruction Manual
15
MAINTENANCE
PROCEDURES
To ensure safe, dependable operation of the paint mixer, follow the
maintenance schedule detailed below:
AS NEEDED
Cleaning:
•
Clean all accessible inside surfaces with soap and water.
•
Clean control panel surfaces with soap and water.
•
Clean all outside cabinet surfaces with soap and water.
EVERY 6 MONTHS OR 7500 CYCLES
Adjustments:
•
Adjust belt tension as needed.